Case Studies
534814787520696132

Education

Brigg Primary School

  • Client - North East Lincolnshire Council
  • Work Carried Out - 2007
  • Scope of the Work - New build
  • Approximate Value - £4.7m

New build 450 place primary school with sustainable specifications for green roof, carried out under a partnership arrangement.

Don, Leven and Washburn Building, Hull

  • Client - Hull University
  • Work Carried Out - 2008
  • Scope of the Work - Development and refurbishment work
  • Approximate Value - £1.6m

A refurbishment and alteration project at Hull University constructing a common entrance and connecting 3 existing faculties. Adhering to clients specification to achieve a contemporary finish.

Swinemoor School, Beverley

  • Client - East Riding of Yorkshire Council
  • Work Carried Out - 2010
  • Scope of the Work - School Refurbishment and upgrade
  • Approximate Value - £1.3m

Part of a co-location scheme, Hall Construction team took to upgrading, extending and refurbishing this busy school. 

Brumby Engineering College

  • Client - North Lincolnshire Council
  • Work Carried Out - 2011
  • Scope of the Work - Managing Contractors under May Gurney for BSF scheme
  • Approximate Value - £1.5m

Hall Construction awarded the management of this BSF scheme contract working beside May Gurney as main contractors. The development of the school was over 3 years and valued in excess of £12m.

Health

Medical Records Store, Hull

  • Client - Hull and East Yorkshire NHS Trust
  • Work Carried Out - 2008
  • Scope of the Work - Refurbishment
  • Approximate Value - £200,000

General refurbishment to warehouse after flood damages and repairs to various warehouse dilapidations

Residential

Wright Street

  • Client - Kingscourt Developments Ltd.
  • Work Carried Out - 2007
  • Scope of the Work - Building Conversion
  • Approximate Value - £2.65m

The conversion of existing warehouse into apartments, with the addition of new build town houses and apartments with 2 roof top penthouses

Dock Street, Hull

  • Client - Hall Dock Developments
  • Work Carried Out - 2008
  • Scope of the Work - Refurbishment and alterations
  • Approximate Value - £1.3m

Hall Construction division took on this project of a derelict property to refurbish and carry out extensive alterations. The property was converted into reisdential flats and retail units at ground level. 

Bayside Development, Bridlington

  • Client - Barratt, York
  • Work Carried Out - 2008
  • Scope of the Work - Refurbishment & New Build
  • Approximate Value - £4.15m

Refurbishment of one existing block and construction of two blocks of appartments and 7 new build houses for Barratt Homes

Keyingham Affordable Homes

  • Client - East Riding of Yorkshire Council
  • Work Carried Out - 2011
  • Scope of the Work - Affordable Housing development
  • Approximate Value - £1m

Construction of 8 new affordable homes. Scheme was won through the YORBuild Framework. Our experience of affordable homes schemes gave us a huge advantage for this scheme and getting positive feedback from the client

Commercial

Smailes Goldie Office Block

  • Client - Smailes Goldie
  • Work Carried Out - 2003
  • Scope of the Work - New build
  • Approximate Value - £1.15m

A New build office block in Central Hull to accomodate clients needs and timeframe. 

Minerva building, Kingswood

  • Client - Kingstown Works Ltd. (KWL)
  • Work Carried Out - 2010
  • Scope of the Work - New office fit out and alterations
  • Approximate Value - £565k

Alterations to empty warehouse. The full refurbishment and fit out of new offices to exsisting shell. 

Prison & Government

Priory Road Police Station, Hull

  • Client - Humberside Police Authority
  • Work Carried Out - 2009
  • Scope of the Work - Flood prevention Works
  • Approximate Value - £800,000

Hall Construction were commended by the Institute of Civil Engineers for the flood prevention works carried out on the live 24hr operational Police Station site.

Industrial

Acro Distribution Centre Hull

  • Client - ARCO
  • Work Carried Out - 1999
  • Scope of the Work - New Build Distribution centre
  • Approximate Value - £6m

This Iconic and unmissable building project on the bank of the river humber is undoubtedly a testament to the sizeable projects Hall Construction have completed in the past 125 years and will tackle in the future.

Moorgate Crofts - Rotherham

  • Client - Rotherham Metropolitan Borough Council
  • Work Carried Out - 2005
  • Scope of the Work - New build Project
  • Approximate Value - £4.3m

New build Development consisting of technologically advanced building systems and building finishes including green roof and ground source heating on a partnered arrangement with the client.

Normanby Warehouse

  • Client - North Lincolnshire Council
  • Work Carried Out - 2007
  • Scope of the Work - Design and Build
  • Approximate Value - £2.4m

Design and build project of 10000m2 warehouse and office facitlities including extensive loading bay areas.

Dry's Dispensary, Hull

  • Client - Reckitts Benckiser
  • Work Carried Out - 2010
  • Scope of the Work - Extension Works
  • Approximate Value - £700,000

Extension on existing warehouse and production areas. Refurbishment works were carried out alongside live factory production.

Kohler Mira Factory

  • Client - Kohler Mira
  • Work Carried Out - 2012
  • Scope of the Work - Design & Build Factory and Offices
  • Approximate Value - £2.5m

A 26 week design and build project, meeting clients specification and regulations for a new factory and offices at Wykeland's Melton West Business Park

Retail

Brunswick Shopping Centre, Scarborough

  • Client - Prudential Property Managers Ltd.
  • Work Carried Out - 2009
  • Scope of the Work - Redevelopment scheme
  • Approximate Value - £700,000

Hall construction were contracted to carry out parts of the redevlopment scheme at this busy shopping centre in Scarborough.

Leisure & National

Swanland Village Hall

  • Client - The Swanland Parish council
  • Work Carried Out - 2004
  • Scope of the Work - New build and Refurbishment
  • Approximate Value - £550,000

Refurbishment of exsiting building and construction of new extension

Bridlington Spa refurbishment

  • Client - Wates Construction Ltd.
  • Work Carried Out - 2006
  • Scope of the Work - Alteration and refurbishment
  • Approximate Value - £700,000

Contracted through Wates construction Ltd. Hall Construction delivered the alterations and refurbishment to this landmark building on the sea front.

St Johns Church

  • Client - Project Community Developments Ltd.
  • Work Carried Out - 2007
  • Scope of the Work - renovation of Church
  • Approximate Value - £530,000

Project for the renovation and extensive refurbishment of St Johns Church. The Joinery work was manufactured by The Groups joinery division Batty Joinery.

Cottingham Learning Resource Centre

  • Client - East Riding of Yorkshire Council
  • Work Carried Out - 2007
  • Scope of the Work - New build
  • Approximate Value - £646,000

Work carried out on a new build adult learning and resource centre, fitting DDA accessibility regulations 

Kilnwick Percy Lodges

  • Client - KP Living
  • Work Carried Out - 2009
  • Scope of the Work - Design & Build
  • Approximate Value - £1.1m

Another Design and Build Project For Hall Construction Division, incorporating a sustainable design and a contemporary style for these holiday lodges.

William Gee Sports Pavilion

  • Client - Balfour Beatty
  • Work Carried Out - 2011
  • Scope of the Work - New build sports pavilion
  • Approximate Value - £900K

Construction of college sports pavillion and related flood defense works, over seen by Balfour Beatty. The project was part of a BSF scheme on Wyke College, Hull