Brigg Primary School
- Client - North East Lincolnshire Council
- Work Carried Out - 2007
- Scope of the Work - New build
- Approximate Value - £4.7m
New build 450 place primary school with sustainable specifications for green roof, carried out under a partnership arrangement.
Don, Leven and Washburn Building, Hull
- Client - Hull University
- Work Carried Out - 2008
- Scope of the Work - Development and refurbishment work
- Approximate Value - £1.6m
A refurbishment and alteration project at Hull University constructing a common entrance and connecting 3 existing faculties. Adhering to clients specification to achieve a contemporary finish.
Swinemoor School, Beverley
- Client - East Riding of Yorkshire Council
- Work Carried Out - 2010
- Scope of the Work - School Refurbishment and upgrade
- Approximate Value - £1.3m
Part of a co-location scheme, Hall Construction team took to upgrading, extending and refurbishing this busy school.
Brumby Engineering College
- Client - North Lincolnshire Council
- Work Carried Out - 2011
- Scope of the Work - Managing Contractors under May Gurney for BSF scheme
- Approximate Value - £1.5m
Hall Construction awarded the management of this BSF scheme contract working beside May Gurney as main contractors. The development of the school was over 3 years and valued in excess of £12m.
Wright Street
- Client - Kingscourt Developments Ltd.
- Work Carried Out - 2007
- Scope of the Work - Building Conversion
- Approximate Value - £2.65m
The conversion of existing warehouse into apartments, with the addition of new build town houses and apartments with 2 roof top penthouses
Dock Street, Hull
- Client - Hall Dock Developments
- Work Carried Out - 2008
- Scope of the Work - Refurbishment and alterations
- Approximate Value - £1.3m
Hall Construction division took on this project of a derelict property to refurbish and carry out extensive alterations. The property was converted into reisdential flats and retail units at ground level.
Bayside Development, Bridlington
- Client - Barratt, York
- Work Carried Out - 2008
- Scope of the Work - Refurbishment & New Build
- Approximate Value - £4.15m
Refurbishment of one existing block and construction of two blocks of appartments and 7 new build houses for Barratt Homes
Keyingham Affordable Homes
- Client - East Riding of Yorkshire Council
- Work Carried Out - 2011
- Scope of the Work - Affordable Housing development
- Approximate Value - £1m
Construction of 8 new affordable homes. Scheme was won through the YORBuild Framework. Our experience of affordable homes schemes gave us a huge advantage for this scheme and getting positive feedback from the client
Smailes Goldie Office Block
- Client - Smailes Goldie
- Work Carried Out - 2003
- Scope of the Work - New build
- Approximate Value - £1.15m
A New build office block in Central Hull to accomodate clients needs and timeframe.
Priory Road Police Station, Hull
- Client - Humberside Police Authority
- Work Carried Out - 2009
- Scope of the Work - Flood prevention Works
- Approximate Value - £800,000
Hall Construction were commended by the Institute of Civil Engineers for the flood prevention works carried out on the live 24hr operational Police Station site.
Acro Distribution Centre Hull
- Client - ARCO
- Work Carried Out - 1999
- Scope of the Work - New Build Distribution centre
- Approximate Value - £6m
This Iconic and unmissable building project on the bank of the river humber is undoubtedly a testament to the sizeable projects Hall Construction have completed in the past 125 years and will tackle in the future.
Moorgate Crofts - Rotherham
- Client - Rotherham Metropolitan Borough Council
- Work Carried Out - 2005
- Scope of the Work - New build Project
- Approximate Value - £4.3m
New build Development consisting of technologically advanced building systems and building finishes including green roof and ground source heating on a partnered arrangement with the client.
Normanby Warehouse
- Client - North Lincolnshire Council
- Work Carried Out - 2007
- Scope of the Work - Design and Build
- Approximate Value - £2.4m
Design and build project of 10000m2 warehouse and office facitlities including extensive loading bay areas.
Brunswick Shopping Centre, Scarborough
- Client - Prudential Property Managers Ltd.
- Work Carried Out - 2009
- Scope of the Work - Redevelopment scheme
- Approximate Value - £700,000
Hall construction were contracted to carry out parts of the redevlopment scheme at this busy shopping centre in Scarborough.
Swanland Village Hall
- Client - The Swanland Parish council
- Work Carried Out - 2004
- Scope of the Work - New build and Refurbishment
- Approximate Value - £550,000
Refurbishment of exsiting building and construction of new extension
Bridlington Spa refurbishment
- Client - Wates Construction Ltd.
- Work Carried Out - 2006
- Scope of the Work - Alteration and refurbishment
- Approximate Value - £700,000
Contracted through Wates construction Ltd. Hall Construction delivered the alterations and refurbishment to this landmark building on the sea front.
St Johns Church
- Client - Project Community Developments Ltd.
- Work Carried Out - 2007
- Scope of the Work - renovation of Church
- Approximate Value - £530,000
Project for the renovation and extensive refurbishment of St Johns Church. The Joinery work was manufactured by The Groups joinery division Batty Joinery.
Kilnwick Percy Lodges
- Client - KP Living
- Work Carried Out - 2009
- Scope of the Work - Design & Build
- Approximate Value - £1.1m
Another Design and Build Project For Hall Construction Division, incorporating a sustainable design and a contemporary style for these holiday lodges.
William Gee Sports Pavilion
- Client - Balfour Beatty
- Work Carried Out - 2011
- Scope of the Work - New build sports pavilion
- Approximate Value - £900K
Construction of college sports pavillion and related flood defense works, over seen by Balfour Beatty. The project was part of a BSF scheme on Wyke College, Hull





























































